Skip to main content

LOCATION: BERLIN, DE // STATUS: ACTIVE

BimboLawrenceDamitan

  • Applied Cybersecurity
  • GRC & IT Risk
  • Software Engineering
  • AI Evaluation
Scroll to explore

01 — BACKGROUND

Hi, I'm Bimbo. I work at the intersection of applied cybersecurity, GRC and IT risk, software engineering, and AI evaluation. My computer science background supports hands-on work in risk assessment, digital evidence, OSINT, security-focused development, automated testing, and technical research.

I am an MSc Applied Cybersecurity candidate at SRH Berlin through the Erasmus Mundus CyberMACS programme. My recent work includes approved repository-level engineering tasks, TÜBİTAK-funded research, and two accepted research papers in 2026.

  • ◆M.Sc. Applied Cybersecurity · CyberMACS Erasmus Mundus Joint Master · 2025–2027ONGOING
  • ◆Current · SRH Berlin University of Applied Sciences · Berlin · 2026–2027
  • ◆Year 1 · Kadir Has University · Istanbul · Sep 2025–Sep 2026
  • ◆B.Sc. Computer Science · Ajayi Crowther University · 2018–2022 · CGPA 4.37/5.00
02 — ARSENAL

Technical Capabilities

// CYBERSECURITY & GRC

GRCIT Risk / Risk ManagementSecurity ControlsSecurity AssuranceOSINTDigital EvidenceNetwork & Systems SecurityNmapKali Linux Fundamentals

// SOFTWARE & ENGINEERING

PythonTypeScriptJavaScriptReact / Next.jsDjango / DRFREST APIsSQL / MySQLGit / GitHub

// TESTING & AI EVALUATION

Automated TestingRegression ValidationDebuggingReference ImplementationsBenchmark CalibrationRepository-Level EvaluationVitestTesting Library

// AI, DATA & RESEARCH

RAGPandasNumPyLangChainChromaDBOllamaStreamlitMatplotlibTableauExcelGENeSYS-MOD
03 — OPERATIONS

Field Experience

Aug 2026 - Sep 2026
Remote

Software Engineering Evaluator / AI Task Author

AfterQuery
  • ▹Authored, calibrated, and delivered 33 approved repository-level software engineering tasks across Python, Django/DRF, and React/TypeScript codebases.
  • ▹Developed feature implementations, fixes, refactors, reference solutions, and automated test suites that validated required behavior and guarded against regressions.
  • ▹Diagnosed verifier, environment, and edge-case failures while refining specifications and Git-based evaluation workflows for repeatable results.
Nov 2025 - Sep 2026
Istanbul, Türkiye

Research Assistant

Kadir Has University / TÜBİTAK Project 223N004 (Man0EUvRE)
  • ▹Contributed to research on Türkiye's and Europe's transition toward Net-Zero 2050 through long-term energy-system and scenario analysis.
  • ▹Used GENeSYS-MOD to examine energy-transition pathways, hydrogen production and storage, and hydrogen-enabled sector coupling.
  • ▹Supported Python-based data processing, literature synthesis, research documentation, and accepted EEM 2026 research outputs.
May 2024 - Sep 2025
Abuja, Nigeria

Information Technology Specialist

Kehinde & Partners LP
  • ▹Provided technical analysis on cases involving cybersecurity, data breaches, and digital evidence collection for legal investigations.
  • ▹Implemented legal tech solutions for e-discovery and managed IT systems ensuring secure organizational operations.
  • ▹Led graphic design initiatives, including the structural layout and visual design of the firm's central catalog and promotional materials.
Dec 2022 - Oct 2023
Abuja, Nigeria

Data Analyst / Monitoring & Evaluation Intern (NYSC)

Transmission Company of Nigeria (TCN)
  • ▹Analyzed operational data from electricity generation systems, monitoring critical infrastructure performance across multiple substations.
  • ▹Developed data visualizations and dashboards to support operational decision-making and national energy evaluation processes.
Aug 2022 - Nov 2022
Abuja, Nigeria

Librarian / IT Support Specialist

Yemi Akinseye-George SAN & Partners / Centre for Socio-Legal Studies
  • ▹Provided day-to-day hardware and software support while maintaining digital information resources for legal and research teams.
  • ▹Created and maintained a structured electronic catalogue that improved document and library-resource retrieval.
Jul 2021 - Aug 2021
Abuja, Nigeria

IT Intern

HiiT Plc
  • ▹Supported web development, Python, data, design, troubleshooting, and general IT activities.
04 — INTEL

Research & Publications

An Empirical Study of the Privacy-Utility Trade-off in Differentially Private Classifiers

23rd Conference on Informatics and Information Technologies (CIIT), 2026Accepted

Authors: Amar Kumar Mandal, Bimbo Lawrence Damitan, Bisola Favour Adediji, Mila Dodevska, SM Dedar Alam, Zhivko Atanaskoski, Zorica Karapancheva, Vesna Dimitrova

PDF

Evaluates the privacy-utility trade-off of applying Differential Privacy (DP) to machine learning classifiers in healthcare. The study demonstrates that DP Random Forest models maintain a 15% utility advantage over Logistic Regression models under strict privacy mandates (where ε ≤ 1.0).

Hydrogen-Enabled Sector Coupling in Türkiye's Energy Transition: Integrated Modeling with GENeSYS-MOD

European Energy Market (EEM 2026)Accepted

Authors: Gokhan Kirkil, Oluremi Success Oyejide, Saiqa Dilawaiz, Bimbo Lawrence Damitan

PDF

Uses GENeSYS-MOD to examine hydrogen-enabled sector coupling in Türkiye's long-term energy transition and its connection to wider European decarbonization pathways through 2050.

Cybercrime in Nigeria: Aligning Domestic Law with International Criminal Standards through SOPs and SETA Reform

Independent Research, 2026In Progress
Read insight

An ongoing study of the operational gap between cybercrime law and enforcement in Nigeria, with a focus on reliable evidence workflows, institutional coordination, and role-specific capability building.

05 — STAY UPDATED

Stay Updated with the Latest Threats

Automated live feed monitoring recent zero-days, vulnerabilities, and cyber intelligence reports.

06 — DEPLOYMENTS

Key Projects

Featured Case Study
COMPLETED

Governance, Risk & Compliance

Cyber Risk Register

A React and TypeScript GRC application for documenting, scoring, prioritising, and managing cybersecurity risks through accessible, test-backed workflows.

System Architecture

  • Risk Model: Uses a deterministic 5 × 5 likelihood-and-impact model to calculate scores and severity levels.
  • Operational Workflow: Supports risk treatment tracking, accessible CRUD interactions, filtering, sorting, ownership, statuses, and target dates.
  • Data Resilience: Persists changes locally and provides schema-validated JSON import and export.
  • Quality Engineering: Verified by 80 automated tests covering core workflows, calculations, accessibility, persistence, and data portability.
React 19TypeScriptViteVitestTesting LibraryAccessibilityWeb Storage API
Risk register dashboard with portfolio filters, severity scores, owners, statuses, and target dates
Keyboard-accessible dialog for creating a complete cyber risk record
Featured Case Study
COMPLETED

Local Retrieval-Augmented Generation

CyberMACS RAG Mentor

A local Retrieval-Augmented Generation assistant for querying CyberMACS programme material through source-aware retrieval and local LLM inference.

System Architecture

  • Knowledge Base: Stores 4,680 embedded document chunks in a persistent ChromaDB vector store.
  • Chunking: Uses 500-character chunks with a 50-character overlap.
  • Retrieval: Applies top-k = 10 similarity search before local generation.
  • Local Inference: Uses Ollama and Llama 3.1 through an interactive Streamlit interface.
PythonLangChainChromaDBOllamaLlama 3.1Streamlit
CyberMACS RAG Mentor — image 1
CyberMACS RAG Mentor — image 2
Featured Case Study
COMPLETED

Energy-System Modeling / TÜBİTAK

GENeSYS-MOD Energy Transition Research

Supported Man0EUvRE research on Türkiye's and Europe's transition toward Net-Zero 2050 through Python-based data processing, scenario analysis, and hydrogen-enabled sector-coupling modeling.

System Architecture

  • Modeling Framework: Used GENeSYS-MOD to examine long-term energy-transition pathways and hydrogen-enabled sector coupling.
  • Data Workflow: Supported Python-based processing, scenario analysis, result validation, and research documentation.
  • Research Output: Contributed to the accepted EEM 2026 paper connecting Türkiye's transition pathways with the wider European energy system.
PythonPandasGENeSYS-MODPyAMScenario Analysis
Hydrogen production and use across GoRES, NECPEssentials, REPowerEU, and Trinity scenarios
FIG. 01Hydrogen production and use across GoRES, NECPEssentials, REPowerEU, and Trinity scenarios
Installed capacity by technology, 2020–2060
FIG. 02Installed capacity by technology, 2020–2060
07 — RECOGNITION

Certifications & Awards

4TH
WINTER SCHOOL CTF 2026
ISC2
CERTIFIED IN CYBERSECURITY (CC)
15+
CERTIFICATIONS & COURSES
ISC2

Certified in Cybersecurity (CC)

ISC2·Jan 2026

Foundational certification validating expertise in security principles, access controls, and network security.

Cisco

CCNA: Introduction to Networks

Cisco·Nov 2025

Validation of foundational networking protocols, routing, and switching infrastructure.

Show Credential
OPSWAT

Critical Infrastructure Protection (ICIP)

OPSWAT·May 2024

Specialized training in securing industrial control systems and critical data pipelines.

Show Credential
Udemy

Data Visualization in Tableau & Python

Udemy·Jan 2025

Advanced plotting, data modeling, and visual analytics using Matplotlib and Seaborn.

Show Credential
08 — CREATIVE DIRECTION

Visual Work

Typography•Branding•Corporate Identity
Democracy Day Campaign
Corporate Identity

Democracy Day Campaign

June Editorial Design
Brand Communications

June Editorial Design

August Welcome Graphic
Corporate Communications

August Welcome Graphic

September Brand Update
Corporate Identity

September Brand Update

Workers' Day Editorial
Brand Communications

Workers' Day Editorial

Easter Corporate Greeting
Corporate Identity

Easter Corporate Greeting

Season's Greetings
Corporate Communications

Season's Greetings

Democracy Day Campaign
Corporate Identity

Democracy Day Campaign

June Editorial Design
Brand Communications

June Editorial Design

August Welcome Graphic
Corporate Communications

August Welcome Graphic

September Brand Update
Corporate Identity

September Brand Update

Workers' Day Editorial
Brand Communications

Workers' Day Editorial

Easter Corporate Greeting
Corporate Identity

Easter Corporate Greeting

Season's Greetings
Corporate Communications

Season's Greetings

09 — COMMS

Establish Connection

I am open to opportunities and collaboration across cybersecurity, GRC and IT risk, software and AI evaluation, OSINT, and applied research. If that overlaps with what you are building, let's connect.

© 2026 · Bimbo Lawrence Damitan · All rights reserved